Reduced Level Excavation & Piling Mat Installation
Substructure Works
RC Super-Structure (PT Frame)
New Drainage and Services
External Works
Working with Leadbitter, to construct a new teaching block and sports hall, Over 3 no. phases and develop the infrastructure within the existing school grounds at Twickenham Academy.
Reduced Level Excavation & Piling Mat Installation
Substructure Works
RC Super-Structure (PT Frame)
New Drainage and Services
External Works
Working with Leadbitter, to construct a new teaching block and sports hall, Over 3 no. phases and develop the infrastructure within the existing school grounds at Twickenham Academy.


© Amery Construction Limited, Flannery House, Third Way Wembley, Middlesex, HA9 0RZ
Amery Construction Limited is registered in England and Wales. | Company no. 3904005 | Registered office – 27A Maxwell Road, Northwood, Middlesex, HA6 2XY | VAT registration no. GB 766 2587 89.